中国·威尼斯娱人城官网-www.3788v.com

首页 > 解决方案 > Case
解决方案 案例展示

Key project - Guiyang-Guangzhou High-speed Railway

 
 

Guiyang-Guangzhou High-speed Railway is also called Guiyang-Guangzhou passenger dedicated line,which goes across Qiannan, Qiandongnan, Liuzhou, Guilin, Hezhou, Zhaoqing, Foshan and arrives at Guangzhou South Railway Station.  

The design standard of Guiyang-Guangzhou High-speed Railway adopts double line electrification, with a design speed of 300 km / hour for infrastructure. The entire length is 857 kilometers, including 207.5 kilometers in Guangdong, 348.5 kilometers in Guangxi province and 301 kilometers in Guizhou.Bridge and tunnel cover 81% of the entire length. The running time of train from Guiyang to Guangzhou has reduced to about 4 hours.

The Guiyang-Guangzhou High-speed Railway was officially put into use on December 26, 2014.

The GSM-R repeater produced by Ticom Tech is used in the nearly 600- kilometer-weak field blindness in Guangdong and Guangxi, so as to meet the requirements of modern scheduling, the movement of public affairs, the information transmission of vehicle and ground and the train control.  

 
 
 

上一条:Key project - Datong-Xi'an High-speed Railway

下一条:Key project -- Harbin-Qiqihar high-speed railway